Bernat Csuka
We apply leading-edge technology to our work across sectors as diverse as housing and underground railways, developing digital solutions that do what digital does best: discover and manage large amounts of disparate data, and create intelligent, efficient outputs.. For hospitals, this may mean managing patient flow through appointments and waiting times, or making sure that people can follow their entire treatment journey (including the physical one from the car park to the treatment room) on their phone.. As with design, engineering and construction, digital expertise is part of the Bryden Wood package.. Design to Value is our driving principle as a company.
With concept and design project stages – where this work is often done – being where the largest potential gains can be made, the power to positively influence a project with thorough optioneering to reduce risk and increase predictability is crucial..Creating flexible, digital models that reflect the world around us.
This is where the real strengths of Discrete Event Simulation (DES), or time-based process simulation, can be brought in.Using tools such as Lanner Witness or AnyLogic, a digital model can be created from the macro to the micro scale, including global supply chain and logistics, down to individual site operations.Digital models built within these tools are made with the logic and rules necessary to represent the real-world process and constrain the system.
These are typically based around the flow of operations, their dependencies and the resources required to complete them.However, one does not need to rigidly prescribe any of these aspects in detail, or hard-code them, to derive the results, but rather use the simulation engine to logically sequence operations and how resources are used.. A simple example of this could be a set of assembly operations occurring simultaneously, which use both shared components – bolts, for example – and resources, such as an operator or a wrench.
Creating this model in a simulation tool would require defining individual assembly sequences and required resources at each step, the resources available and, depending on the requirements of the project, component stock, transport, and necessary aspects of the supply chain.
When the model is run, the simulation engine dynamically uses resources and components to complete the tasks and the model statistics derived could indicate how both individual processes, and the system, would perform..To rethink the status quo, we need to question how spaces have been designed traditionally, including their size, location, density and layout; and ultimately upgrade them to higher, more sustainable standards, using building physics, science and analytic tools..
Traditionally, offices in the UK are large spaces located in city centres, accommodating all staff in the same location, where connectivity and business opportunities are at hand.This idea is already being challenged by companies who are moving towards operating smaller hubs, strategically located at walking or cycling distance from the areas where staff live, often far from the city centre.. With people having demonstrated they are able to work from home effectively (and sometimes more effectively), offices do not need to be sized to operate constantly at full occupancy.
This approach is beneficial for improving sustainability and work-life balance, reduces time spent commuting and lessens corporate carbon emissions from heating, cooling and especially daily commuting, which typically accounts for the highest proportion of a company’s carbon footprint.. Bryden Wood carried out an internal carbon emissions audit, which showed that the adoption of home-working can reduce corporate emissions by 69% compared to working five days a week in the office.This is mainly due to the reduction in emissions from Scope 3 (commuting)..